In Construction
Castle Street improvements
Improvements being made
We will upgrade the temporary pop-up cycleway to a permanent segregated cycleway along Castle Street and improve:
- bus stops along Kingsway and North Road,
- paving,
- drainage,
- street lighting,
- signage, and
- road surfacing.
The upgraded cycleway will stay on the north side of Castle Street. We will need to make changes to key junctions and small changes to the loading bays.
There are no major changes to lane allocation.
We have carried out extensive traffic modelling to make sure Castle Street meets air quality requirements and active travel guidance.
We have previously consulted on the changes to Castle Street have appointed a contractor to carry out the improvement works.

Westgate Street Junction
- Start of fully segregated cycleway to tie in with existing pop-up
- Change to lane allocation to provide a combined right turn and straight-ahead lane from Castle Street into Westgate Street
- Amendments to pedestrian crossing
- Paving replaced
- Position and size of yellow box improved
- New cycle lane from Westgate Street through junction with cycle traffic lights
Womanby Street and Castle Arcade junctions
- Changes to carriageway and footway at Womanby Street and Castle Arcade
- Fully segregated cycleway continues
- Cycling parking facilities
- Existing bus lane extended to end of bus layby
- Proposed green roof bus shelter
- Paving renewed
High Street junction
- Paving improvements
- Street furniture decluttering at the entrance to Cardiff Castle
- New bollard arrangement (to be confirmed)
- Fully segregated cycleway continues
- Existing bus lane to stay
- Minor amendments to loading bay
- Paving improvements and street furniture decluttering at the High Street junction
- Loading bay and taxi rank area merged into one larger bay
- Existing bus lane to stay
Queen Street junction
- Realignment of pedestrian crossing to match desire line to Queen Street
- Fully segregated cycleway continues
- Wildflower landscaping
- Loading bay and taxi rank area merged into one larger bay
- Existing bus lane to stay
- Proposed green roof bus shelter
Kingsway junction
- Alterations to bus stops
- Green roof bus shelter
- Bus island
- Cycleway zebra crossing to bus island
- Controlled crossing to bus island
- Wildflower landscaping
- Right turn lane introduced for buses only from Kingsway on to Castle Street/North Road (A4161)
- 2 trees to be removed and additional trees planted near by
Changes near Cardiff Castle
Any works located immediately adjacent to the castle require a Scheduled Monument Consent application. CADW has approved both the application and the proposed design, and they are overseeing the works on site.
When the work is taking place
The work is due to start in January 2026 and expected to run until January 2027. This will be confirmed once we have appointed a contractor.
We plan to start the work at the Kingsway junction and work round towards Westgate Street.
Traffic management and access
Knights Brown have been awarded the contract to deliver these works on behalf of Cardiff Council.
They will be responsible for:
- Maintaining access to all businesses and residences.
- Planning and implementation of the traffic management needed to do the work.
Two-way traffic on Castle Street will be maintained when possible. There may be temporary traffic lights set up to allow sections of the scheme to be constructed safely. Any closures will be communicated well in advance.
Access to shops and buildings will be maintained throughout the works.
We will work with businesses to make sure deliveries are not affected.
Updates will be provided by Knights Brown through:
• Letters delivered ahead of and during key stages of the project
• Website updates: www.kbinfowales.co.uk
• Dedicated Liaison Officers: Tracy Beall and Kate Baynham who will be available throughout the project
• Letters delivered ahead of and during key stages of the project
• Website updates: www.kbinfowales.co.uk
• Dedicated Liaison Officers: Tracy Beall and Kate Baynham who will be available throughout the project
Email: Talktous@knightsbrown.co.uk
Telephone: Tracy Beall- 07977 091261, Kate Baynham- 07484 949805